Featured Projects
Proven Results

A closer look at how we restore, upgrade, and transform vacant properties — on time, within budget, and with zero follow-up.

Interior Repairs, Electrical Upgrades & HVAC Replacement

Vacant Property
Timeline
9 Days
Location
Columbus, OH
Trades
Electrical, HVAC, Drywall
Scope of Work
  • Upgraded lighting with new fluorescent acoustic grid fixtures
  • Repaired basement bulkhead with acoustic drywall and heavy texture finish
  • Surface preparation, priming, and painting (2 coats)
  • Exterior insulated metal door installation including frame and lock set
  • Aluminum trunk cable installation
  • Full replacement of HVAC system (AC unit)
  • Thorough property cleanup and final inspection
Outcome

Delivered with full commitment to accuracy, long-lasting quality, and genuine value. All stages completed using quality materials, within the allotted time, cost-effectively, and with no follow-ups required.

Roof Replacement & Exterior Restoration

Vacant Property
Timeline
9 Days
Location
Carlsbad, NM
Area Covered
2,572 + 496 sq ft
Main Roof Replacement
  • Full tear-off and disposal of existing 3-tab shingles (2,572 sq ft)
  • Installation of new roofing felt underlayment
  • Installation of new 25-year composition shingles
  • Replacement of drip edge for improved water runoff
  • New pipe jack flashings and roof vents for proper ventilation
Flat Roof Replacement
  • Removal and replacement of modified bitumen roofing system
  • Installation of new drip edge
  • Replacement of damaged roof decking (496 sq ft)
Outcome

Executed with careful attention to durability, accuracy, and quality. Fulfilled on schedule with zero punch-list items — helping the client convey the property well before their deadline.

Interior Repairs, Painting, Electrical & HVAC Replacement

Vacant Property
Timeline
16 Days
Location
Calumet City, IL
Complexity
Multi-Crew, Multi-Trade
Scope of Work
  • Full central AC system replacement
  • Replace and paint stair riser
  • Drywall replacement with insulation, baseboard, and quarter round (basement, utility & furnace rooms)
  • Interior door replacements with casing and doorknobs in multiple rooms
  • Remove and reset appliances; replace furnace vent and water heater
  • Snap-lock laminate flooring replacement in basement bedrooms
  • Complete plumbing repairs; detach and reset sink, vanity, and toilet
Outcome

A complex multi-crew project requiring detailed scheduling and airtight communication. Completed on time with quality materials at a competitive price — a fully renovated property with nothing left to chance.

Full Interior Renovation & System Upgrades

Foreclosed Vacant Property
Timeline
18 Days
Location
Pueblo, CO
Type
Large-Scale Rehabilitation
Scope of Work
  • Interior restoration: drywall replacement, surface preparation, and painting across multiple areas
  • Bathroom & finish upgrades: fixture replacements, ceiling tile, exhaust fan, interior doors, stairway handrail
  • Full electrical upgrades: new circuits, wiring, outlets, light fixtures, EMT conduit, and complete 100-AMP service panel replacement
  • Major plumbing & HVAC: plumbing line replacements, sink and valve replacements, new water heater, and full furnace replacement with venting
Outcome

Completed in just 18 days despite permit coordination and multi-trade sequencing. A true turnkey solution — fully restored, code-conscious, and market-ready — that reduced the client's holding costs and accelerated their listing timeline.

Roofing, Siding & Exterior Repairs

Vacant Property
Timeline
9 Days
Location
Elizabeth City, NC
Type
Exterior Rehabilitation
Scope of Work
  • Full roof replacement with 25-year shingles, roofing felt, underlayment, ridge vent, and flashing
  • Satellite detach and reset during roofing
  • Siding repair and replacement, including PVC fascia boards replacement
  • Fence repair and stabilization, including gate and post replacement
Outcome

Coordination of multiple trades within an exterior project can never be easy—and it was particularly difficult with this one due to the fact that the same scheduling would apply for all the teams involved. Our team took a structured approach from day one: detailed sequencing, trade-specific supervision, and consistent quality checks at every step. In the end, we delivered a beautiful and durable property that needed absolutely nothing else done to it.

Roofing Replacement & Exterior Maintenance

Vacant Property
Timeline
8 Days
Location
Las Vegas, NM
Type
Roof & Exterior Upgrade
Scope of Work
  • Full roof tear-off and replacement with 25-year shingles (2,356 sq ft)
  • Installation of underlayment, drip edge, flashing, and roof vents
  • Skylight reglazing with a new flashing kit
  • Shed roof replacement and main level window screen replacement
Outcome

There are some projects that measure your technical abilities, while others measure your capacity for coordination. This one demanded both. As all the crews moved one after another within a short time frame, the trick was in planning—knowing when each step must start, how each trade would be passed to the next, and where quality control is necessary before continuing. The result is a neat external finish accomplished according to plan and schedule, with no further corrections necessary.

Full Roof Replacement & Fence Restoration

Vacant Property
Timeline
11 Days
Location
Batson, TX
Type
Structural Exterior Restoration
Scope of Work
  • Full roof tear-off and replacement with 25-year composition shingles (2,954 sq ft)
  • Installation of underlayment, starter shingles, drip edge, pipe jack flashing, ridge caps, and turbine roof vent
  • Repair of damaged sheathing and selective shingle replacement
  • Fence repair including panel replacement, post installation, and section stabilization
Outcome

This wasn't a surface-level refresh—it was a structural commitment to long-term performance. With both roofing and fencing systems requiring structural attention, our crews had to think beyond aesthetics and focus on how each component would function together over time. Repairs were made at the source, not patched over, and each step was carefully taken with consideration towards its effect on the overall structure. What the client received was a property that's genuinely weather-ready—reinforced where it needed to be and finished with craftsmanship that doesn't invite callbacks.

Interior Restoration, Exterior Repairs & Roof Reconstruction

Vacant Property
Timeline
14 Days
Location
Ashland, KY
Type
Full Property Renovation
Scope of Work
  • Interior work: drywall repairs, popcorn ceiling refinishing, insulation replacement, interior painting, window and trim repairs, and laminate flooring installation across multiple rooms
  • Exterior upgrades: replacement of gutters, soffit, fascia, siding, exterior fixtures, and minor structural elements including posts and stone veneer
  • Roof reconstruction: full replacement including shingles, underlayment, drip edge, major structural repairs such as sheathing and rafters, along with vent and flashing updates
  • Additional improvements: replacement of storage shed and fence, plus full site cleanup
Outcome

A total renovation of the entire property requires more coordination than any other job, and this renovation went through all aspects of the property—from its roof structure down to the inside living areas. Interior restoration, exterior construction, and roof reconstruction had to be coordinated perfectly. Timing, sequencing, and cross-trade communication were as critical as the physical work itself. The final product was a fully renovated property, with its structure, cleanliness, and coherence all in order.

Full Interior Renovation & System Upgrades

Vacant Property
Timeline
19 Days
Location
Bristol, PA
Type
Complete Interior Rebuild
Scope of Work
  • Interior restoration: drywall replacement, ceiling texture removal/refinishing, and full interior painting across all rooms
  • Flooring upgrades: installation of vinyl, laminate, and wood flooring, including sanding, staining, and finishing
  • Kitchen & utility improvements: cabinet, countertop, sink, appliance reset, and water heater replacement
  • Trim & finish work: baseboards, crown molding, shelving, and trim replacement with painting and finishing
  • Mechanical & fixtures: baseboard heating system updates, lighting fixture resets, and plumbing fixture adjustments
  • Finalization: full cleaning, debris removal, and complete photo documentation with measurements
Outcome

From the outside, this property told one story. On the inside, the story was completely different. This was a complete interior rebuild—a process of systematically tearing apart and reconstructing the interior systems and finishes of the home in each room, one by one. Everything was done according to a planned schedule, where the previous stages had to be completed before the next one could begin, with no loose ends hidden behind new finishes. The result was a home that felt brand-new, with cohesive finishes and solid construction, ready to be lived in for many years to come.